Command
2026-08-30 · 09:14All systemsWork in hand
28.97M
SAR · revised contract value
Certified unpaid
3.42M
1.09M over 60 days
Retention held
796K
SAR owed back to you
Kontra alerts
1
forfeiture · cl 7.2 · 265d
Kontra · forfeiture · SC-2214 cl 7.2
Act today
The Subcontractor shall not be entitled to an extension of time unless notice of the circumstances causing delay is submitted within 7 days of such delay first occurring. On failure to comply the Time for Completion shall not be extended and the Contractor shall be discharged from all liability.
EV-001 · 2025-12-01 · ZONE-3 ACCESS RESTRICTED · TR-06 DUE 2025-12-08 · UNSERVED
Salvage
- Serve it now regardless. An unanswered late notice is better than silence.
- Check when the clock started. These run from awareness, not the event.
- Check whether the Contractor missed the same notice upstream.
- Move the value to a route that has not expired.
Plus · projects
3Nasim Residences64.3%
Yasmin Fit-out88.0%
North Perimeter Works14.0%
Engine log
Live08:14:02 OK ingest SC-2214 · docx+pdf
08:14:03 WARN provenance NOT_EXECUTED · comparison
08:14:03 WARN collision DLP 2412 → 24 | 12
08:14:04 OK appendix 30 rows · milestones 100%
08:14:04 OK compiled 39 rules · 2 heartbeats
08:14:05 ALERT TR-06 cl 7.2 FORFEITURE T+265d
09:02:11 OK payroll draft 84 staff · WPS ready
Kontra is the top band and the red. Plus is everything under it. One screen, and the reason to buy is above the fold.
Clocks
EV-001 · one event · 7 obligations opened| RULE | KIND | OCC | DUE | STATE | EFFECT |
|---|---|---|---|---|---|
| TR-06 | ONE_OFF | 1 | 2025-12-08 | MISSED | EOT forfeited |
| HB-02 | HEARTBEAT | 1 | 2025-12-15 | MISSED | Interim particulars |
| HB-02 | HEARTBEAT | 2 | 2025-12-29 | MISSED | Interim particulars |
| HB-02 | HEARTBEAT | 3 | 2026-01-12 | MISSED | Interim particulars |
| HB-02 | HEARTBEAT | 4 | 2026-01-26 | MISSED | Interim particulars |
| HB-02 | HEARTBEAT | 5 | 2026-09-02 | T-3d | Interim particulars |
| AN-07 | ANCHOR | 1 | 2026-09-06 | OPEN | Insurance certificates |
A recurring duty is a series, not a date. Had TR-06 gone out on day five the verdict would read SLIPPING, not LOST.
Risk register
FO-1180 · 17 flagged · 6 criticalT-PAYWHENPAID · CL 14.3
Do not signIt is a condition precedent to the Contractor's obligation to pay any certified amount that the Contractor has received payment from the Employer of the corresponding amount.
His cash flow becomes your cash flow. If the Employer never pays, the debt never becomes due at all.
Ask for
A longstop: due in any event within N days of certification, paid or not. Failing that, a right to suspend, and interest.
| ID | TRAP | CL | SEV | COST |
|---|---|---|---|---|
| T-NOSUSPEND | No right to suspend for non payment | 14.7 | CRIT | The one remedy that moves money |
| T-CONDPREC | Notice condition precedent, total forfeiture | 8.5 | CRIT | The claim dies on the calendar |
| T-EOTPASS | EOT only if the Contractor obtains one | 8.4 | CRIT | And he need not pursue it |
| T-CAPOFF | Cap disapplied, liability unlimited | 8.7 | CRIT | Exposure exceeds the subcontract |
| T-FINALWVR | Final account waiver | 14.10 | CRIT | Anything omitted is gone |
| T-NOTICECH | Notices valid via one system only | 20.4 | HIGH | A good email notice is void |
It only means something because it discriminates. SC-2214 raises one trap. This raises seventeen.
Contracts
provenance, type and completeness checked before any rule compiles| SOURCE | TYPE | STATE | RULES | CRIT | NOTE |
|---|---|---|---|---|---|
| SC-2214 | SUBCONTRACT | NOT_EXECUTED | 39 | 1 | Comparison file, not the signed original |
| FO-1180 | SUBCONTRACT | COMPLETE | 7 | 6 | Do not sign without negotiation |
| NDA-0431 | NDA | TEMPLATE | 2 | 0 | Cl 4.3 duplicated · one obligation never expires |
| PLANT-SUPPLY | SUPPLY | TEMPLATE | 0 | 1 | Price, programme and validity deferred to documents not supplied |
Zero rules on the supply contract is the correct output, not a failure. The system says why rather than reporting silence.
Projects
Plus · the system the company runs on| PROJECT | REVISED | CERTIFIED | RETENTION | DONE | STATE |
|---|---|---|---|---|---|
| Nasim Residences 32 villas · north sector |
18,820,000 | 12,110,000 | 605,500 | 64.3% | ON SITE |
| Yasmin Fit-out Office floors 3 to 5 |
3,250,000 | 2,860,000 | 143,000 | 88.0% | CLOSING |
| North Perimeter Works 2.4 km perimeter |
6,900,000 | 966,000 | 48,300 | 14.0% | STARTING |
| TOTAL | 28,970,000 | 15,936,000 | 796,800 | ||
Retention held is the column contractors never have in one place. 796,800 riyals of their own money, with three different release dates.
Certificates
IPC 07 · Nasim · period to 31 Aug 2026Cumulative
12,110,000
64.3%
Net this period
1,162,800
after retention and recovery
Total due
1,337,220
including VAT at 15%
| # | SECTION | CONTRACT | PREVIOUS | THIS PERIOD | DONE |
|---|---|---|---|---|---|
| 1 | Preliminaries | 1,200,000 | 780,000 | 60,000 | 70% |
| 2 | Earthworks | 950,000 | 950,000 | 0 | 100% |
| 3 | Concrete works | 6,400,000 | 4,480,000 | 512,000 | 78% |
| 4 | Blockwork | 2,150,000 | 1,505,000 | 215,000 | 80% |
| 5 | Finishes | 4,300,000 | 1,720,000 | 430,000 | 50% |
| 6 | MEP installation | 2,600,000 | 1,040,000 | 130,000 | 45% |
| 7 | External works | 800,000 | 267,000 | 21,000 | 36% |
| TOTAL | 18,400,000 | 10,742,000 | 1,368,000 | 65.8% |
The certificate is generated from measured progress, retention and advance recovery applied, and the cleared tax invoice comes out of the same action.
Cost
Nasim · committed cost includedEarned
12.11M
Cost
10.38M
Margin
14.3%
tendered at 18.0%
Erosion
448K
SAR below tender
| SECTION | EARNED | BUDGET | ACTUAL | VARIANCE |
|---|---|---|---|---|
| Preliminaries | 840,000 | 714,000 | 702,000 | +12,000 |
| Earthworks | 950,000 | 779,000 | 766,500 | +12,500 |
| Concrete works | 4,992,000 | 3,993,600 | 4,310,000 | (316,400) |
| Blockwork | 1,720,000 | 1,410,400 | 1,398,000 | +12,400 |
| Finishes | 2,150,000 | 1,763,000 | 1,921,000 | (158,000) |
| MEP installation | 1,170,000 | 959,400 | 1,043,500 | (84,100) |
Concrete is 316,400 over at 78 per cent complete, so it will finish roughly 400,000 over. Today they learn that at the end of the job.
Workforce
84 staff · Saudi Labour Law rules · payroll 27 AugHeadcount
84
18 Saudi · 66 expat
Saudisation
21.4%
Payroll
1.02M
SAR · WPS file ready
Expiring 90d
6
4 iqama · 1 licence · 1 bond
E-207 · 18 CONSECUTIVE DAYS · ART 80(7)
BlockedPast the fifteen day threshold, but no written warning on file. Dismissing now is defective however clear the absence is, and it converts a strong position into an unlawful termination claim.
Sequence
- Contact on the Qiwa registered number and email, keep the record
- Serve the written warning. Art 80(7) makes it a precondition, not a courtesy
- Allegation in writing, hear the answer, minutes on file
- Only then file on Qiwa with attendance and contact attempts attached
The system never says dismiss. It says what the law allows, what is missing, and the order, because these are lost on procedure not on facts.