A contract is a set of clocks. Most of them are running against you.

The engine reads the subcontract and compiles every clock, gate, threshold and forfeiture it imposes, as rules a machine can run. Then it keeps that plan running against what actually happens on site.

527checks passing
0runtime dependencies
30trap patterns
0network calls while it reads a contract
What it produces

Three things, from one reading.

01

The register

Every one sided clause found, ranked by tier. Each carries the sentence quoted from your contract, what it does to you, and the amendment to ask for.

02

The clocks

Every notice window, particulars interval and payment gate, compiled as rules. The ones where missing the date destroys the entitlement are separated out.

03

The plan, running

Feed it a delay and it opens every obligation that event triggered, tracks which were served, and tells you what is still recoverable.

The difference it makes

One delay event. Two outcomes.

Eighty one days of restricted access, on the same contract, with the same facts. The only difference is whether anyone was counting.

ENTITLEMENT LOST

Nothing served. One event opened eight obligations and every one of them passed. The claim dies on the calendar, not on the facts.

SLIPPING, zero forfeited

Notice served on day five, particulars kept running. Some beats were still missed, but none of them forfeits anything. The claim survives.

This is the worked example that ships with the software, run on the demo contract. It is in the manual.

It refuses rather than guesses

The answer we will not give you is a wrong one.

A tool that quietly picks the wrong number is worse than no tool. Three conditions are enforced in code and tested on every build.

COMMERCIAL TERMS
  Retention                 10%           [HIGH]
  Advance payment           20%           [HIGH]
  Performance security      10%           [HIGH]
  Defects liability period  2412 months   [COLLIDED]  either 24 or 12
      ! Reads as "2412 months", which is not a real value. Two figures are printed
        on top of each other: it is either 24 or 12 months. Confirm from the
        executed original.
  Payment period            3010 days     [COLLIDED]  either 30 or 10
ConditionWhat it means on your contract
It never resolves a value it cannot readA revised figure printed over the one it replaced is reported with both candidates. The difference between 24 and 12 months is a year of liability, and we will not choose it for you
No clause verdict on an unsigned documentDrafts and comparisons are detected. The plan still compiles, so the work is not wasted, but nothing is presented as settled
The Appendix governsIt is the negotiated document. Where it disagrees with the printed conditions, it wins
Tested on documents it had never seen

Eight unrelated documents. No crash, no false answer.

Pulled from live business files and put through the engine cold. The failure that destroys trust in this category is a confident wrong reading, not a refusal.

DocumentWhat it returned
Adversarial fit out subcontractContract at 89 per cent. 17 findings, 6 critical. Do not sign without negotiation
Unfilled supply templateRecognised as a template. Deferred terms raised as critical
Services facilitation agreementContract at 76 per cent, no findings, and said so: nothing flagged is unusual, read it yourself
Saudi labour contractContract at 53 per cent, read and covered by tests
Joint venture agreementPartial. Asserted nothing
A curriculum vitaeNot a contract. Said the wrong document had been supplied
Signed contract, scannedUnreadable. Asked for a text layer before anything else
Unseen tender packClassified it, pulled the reference, five dates and nine requirements, and flagged that every deadline had passed
Where it stands

What runs today, and what does not.

Stated plainly, because you will find out either way and it is better coming from us.

CapabilityStateDetail
Reading the contractLiveWord, Excel, PDF, HTML and email, read natively
The risk registerLive30 trap patterns, each quoted and answered with what to ask for
The compliance planLiveClocks, gates, thresholds and the forfeiture register
Running a live eventLiveObligations opened, served, missed, and what is salvageable
Saudi Labour Law packLiveArticles 80(7) and 117, leave, absence and sick pay banding
Tender intakeLiveBid clock, requirements, bill, scope drift, drafted proposal
ArabicLiveArabic documents, dates and mixed language packs
The consoleLiveInstalled on your own computers, opened from a desktop shortcut
Scanned documentsOpt inRefused by the console. On the command line an opt in reader can transcribe a scan, but it sends page images to an outside service, so it is off unless you ask
Separate user accounts and rolesNot builtNo sign in of its own today, and no audit trail yet

Everything marked live is covered by the test report and documented in the manual.

Coming next, not on sale yet

A Tenders pack that reads an RFP and lists every returnable and date, and a Labour pack for Saudi Labour Law deadlines and procedures for your staff. Same engine, same console. Both build on readers that already pass the test report. No date and no price yet.

Put Kontra+ on your own computers.

The NDA is signed before anything is sent. We reply the same working day.